Monday, 8 August 2011

Decking timber

102m of wood arrived to form the base of the deck.  Only took a mere 6 weeks from orders.  Well, it was French douglas fir.  Just had to let it grow first

Monday, 13 September 2010

Buying the kitchen

Drove to ikea to pick up the kitchen.
French debit cars have a low limit, so it bounced when asked to give €3600 to Ikea.  On the plus side, though, they took a cheque.
Longest receipt ever at 900mm.

Tuesday, 11 May 2010

Let the building continue


The second batch of materials to build the interior

101m2 plasterboard 1.2 x 2.8m
350m 4 x 6cm x 4m treated timber

Friday, 5 February 2010

Let the building commence

The first batch of materials to build the interior

134m2 plasterboard 1.2 x 2.8m
400m 4 x 6cm x 4m treated timber

Saturday, 4 July 2009

Electrolux RM122

 As part of the moving to France gear, I bought a working, but old absorption fridge. £50 ebay.

Pretty rusty, so removed the cooling/heating gear. It stays complete. Cleaned and primed to stop the rust. Nice 3 way fridge. Used a lot of gas and we used 240V when possible. Never got ice!