Decking timber
102m of wood arrived to form the base of the deck. Only took a mere 6 weeks from orders. Well, it was French douglas fir. Just had to let it grow first
Friday, 17 June 2011
Monday, 13 September 2010
Buying the kitchen
Drove to ikea to pick up the kitchen.
French debit cars have a low limit, so it bounced when asked to give €3600 to Ikea. On the plus side, though, they took a cheque.
Longest receipt ever at 900mm.
French debit cars have a low limit, so it bounced when asked to give €3600 to Ikea. On the plus side, though, they took a cheque.
Longest receipt ever at 900mm.
Tuesday, 11 May 2010
Let the building continue
The second batch of materials to build the interior
101m2 plasterboard 1.2 x 2.8m
350m 4 x 6cm x 4m treated timber
Friday, 5 February 2010
Let the building commence
The first batch of materials to build the interior
134m2 plasterboard 1.2 x 2.8m
400m 4 x 6cm x 4m treated timber
134m2 plasterboard 1.2 x 2.8m
400m 4 x 6cm x 4m treated timber
Saturday, 4 July 2009
Electrolux RM122
As part of the moving to France gear, I bought a working, but old absorption fridge. £50 ebay.
Pretty rusty, so removed the cooling/heating gear. It stays complete. Cleaned and primed to stop the rust. Nice 3 way fridge. Used a lot of gas and we used 240V when possible. Never got ice!