11 tonnes of gravel sounds a lot until you realise this is only 30mm over 140m2, which is roughly the parking area we now have. The drive, due to be concreted is another 150m2.
The lorry really struggled to get up the drive, partly because it's rained since Christmas and partly because he did it in reverse, uphill, and managed to get the rear wheels off the drive which then slipped on the grass.
We also dug out another metre on the parking area and gravelled this. All in all, we've used about 10 tonnes and I've shovelled the rest to the edge of the turning circle. Did this in less than a day, so we're quite tired now!
Just a small pile of surplus now.
No comments:
Post a Comment