Monday, 25 March 2013

Another rotten Monday on the piste

You know how it is.  It's Monday again, you're tired, not slept so well, and all you've got to do is ski on 20cm of fresh.



Not a bad set of eights and Ss.  You could say we made a bit of a mess of the mountain.

It took a lot of training, but she's doing alright.

Tuesday, 19 March 2013

Another mole

Well, it seems the cats like to play with moles.  Another one turned up today.  

Not quite sure who got it, but it seems likely that it was porcy.  Quite a big mole.


Saturday, 9 March 2013

Finished bendroom 2

The skirting is now installed in the spare room and all the furniture back in.  Also installed the architrave in the bathroom.

Almost finished the house.

Weather station

I had noticed that the temperatures from the WS were about 5C higher than Tarbes when it's sunny.  So it's been moved to a more exposed position and the temperature & rain gauge are at regulation 1.25m, the wind speed and direction are at 3.5m.

The weather station was originally installed on the pergola near the kitchen door at about 3m on 25/12/12.

Sunday, 3 March 2013

Finished decorating

Well, almost.  Study filled, skirting board and architrave.  Bathroom filled and painted (had under coat and largely filled a year ago)  A little architrave and tiled skirting left there.

But, the 4th bedroom needs painting (2nd coat) and skirting.  The presence of a very large bookcase may prevent the painting, as might a lack of paint.  Only got about 15m2 left.

Tiled skirting in the ensuite would be nice too.